Projects & Estate: Maurice Caeiro

projects-estate

In line with the Chairman’s vision, we have completed renovation on the badminton court, 2nd floor washroom, squash court, swimming pool and more. In the swimming pool the changing rooms, flooring, outdoor shower, exterior décor has been redone.

projects-estate

The badminton and squash court have been painted, floors repaired and polished and the viewing gallery and the washrooms refurbished.

projects-estate

The entrance has been overhauled and redesigned. The Statue of the Holy Family has been accentuated by repositioning it. Further the area in front of the statue has been revamped to accommodate additional parking space. Storm water drains have been reconstructed in the entrance area to prevent water logging.

projects-estate

Despite the space constraint, the washroom on the 2nd floor has been renovated adequately and creatively.

Another very significant project undertaken and commenced in August 2020 is the total revamp of the electrical cabling and change of the old transformer and accessories.